| Freebird Gas Storage L.L.C. | Original Sheet No. 121 : Effective | |
| FERC Gas Tariff | ||
| Freebird Gas Storage L.L.C. | ||
to the Replacement Shipper via facsimile, at which time the Replacement Shipper will have the same rights and obligations as any other existing Shipper on Freebird’s System. Following implementation of the release, Freebird shall post notice of the winning bidder on the Internet Web Site. 4.7 Best Bid. When Freebird makes awards of capacity for which there have been multiple bids meeting minimum conditions, Freebird shall award the bids, best bid first, until all offered capacity is awarded. The capacity being awarded represents the Maximum Daily Injection Quantity, Maximum Daily Withdrawal Quantity, or Maximum Storage Quantity. These quantities are separate parts of the capacity and are awarded until one of the quantities is fully awarded, at which point all capacity is deemed to be fully awarded. Freebird shall evaluate and determine the best bid among those otherwise consistent with any terms and conditions specified by the Releasing Shipper as follows: (a) Freebird shall apply the standard or criteria for such determination specified by the Releasing Shipper, including the standard to be used for breaking ties. Any standard or criteria so specified must be objective, economic, not unduly discriminatory, not contrary to applicable provisions of this FERC Gas Tariff, applicable to all Potential Replacement Shippers and require Freebird applying such standards to exercise no more than a ministerial function. The Releasing Shipper shall indemnify and hold Freebird harmless from and against all demands, losses, claims, expenses, causes of action and/or damages suffered or incurred by Freebird arising out of or related to any determination of a "best bid" pursuant to a standard specified, supplied, approved or provided by Releasing Shipper. (b) In default of Releasing Shipper specifying a bid evaluation standard, Freebird shall determine the bid or bids generating the highest net present value, using a 10% discount factor, based on the rate bid (reservation or demand component), the applicable quantity(ies) and term or period bid upon. In default of Releasing Shipper specifying a method to break ties, priority will be given first to the bid with the shortest term, and next to the bid submitted first in time. 4.8 Qualifications of Potential Replacement Shipper. A Potential Replacement Shipper must be on Freebird’s approved bidders list before bids may be posted on the Internet Web Site, must satisfy all requirements of the applicable Rate Schedule and the General Terms and Conditions of this FERC Gas Tariff, and must have executed a Capacity Release Umbrella Agreement. To be on the approved bidders list, the Potential Replacement Shipper must satisfy Freebird’s credit requirements as outlined in Section 3 of the General Terms and Conditions, and provide the information required by Section 3 of the General Terms and Conditions. Freebird reserves the right to reevaluate and update such credit appraisal as deemed necessary by Freebird in its reasonable judgment. The Potential Replacement Shipper shall remain on the approved bidders list until such Potential Replacement Shipper no longer satisfies Section 3. Freebird will waive the creditworthiness requirement on a non- discriminatory basis for any Potential Replacement Shipper and permit it to submit bids, if the Releasing Shipper provides Freebird with a guarantee or other form of credit assurance in form and substance satisfactory to Freebird of all financial obligations of the Potential Replacement Shipper with respect to the capacity being released by Releasing Shipper prior to the commencement of service to the Replacement Shipper. 4.9 Nominations. Following its selection, and prior to the flow of Gas, the Replacement Shipper shall be permitted to submit nominations pursuant to the terms and conditions of the applicable Rate Schedule and the General Terms and Conditions of this FERC Gas Tariff. 4.10 Billing. The Replacement Shipper shall be billed and make payments to Freebird in accordance with the terms and conditions of the applicable Rate Schedule, other provisions of this FERC
| Issued by: Patrick DeVille Vice President, Marketing | ||
| Issue date: | Effective date: 10/01/08 | |