Top of page top Next Previous


Caledonia Energy Partners, L.L.C.   Original Sheet No. 63A : Effective
FERC Gas Tariff
Caledonia Energy Partners, L.L.C.


(d)     Rate Customer proposes to pay for storage service under AILS Rate
Schedules:
   
Monthly Loan Capacity Charge ($/Dth):          _____________
Identify if Reservation or Volumetric charge applies:_____________
Injection Charge ($/Dth):                    _____________
Withdrawal Charge ($/Dth):                    _____________
Authorized Overrun Injection Charge ($/Dth):     _____________
Authorized Overrun Withdrawal Charge ($/Dth):     _____________
Fuel Reimbursement (% in kind):               _____________
(e)     Term of Service:                         _____________
Commencement Date:                         _____________
Termination Date:                         _____________
22.7     Requested Interruptible Loan Service:
(a)     Request Quantities:
Maximum Interruptible Loan Quantity (MILQ)     _____________
Maximum Daily Withdrawal Quantity (MDWQ)     _____________
Withdrawal Period:               from: ________     to:  ______
Maximum Daily Injection Quantity (MDIQ)          _____________
Injection Period:               from: ________     to:  ______
(b)     Ratchet Levels:
Maximum Daily Withdrawal Quantity Subject to the following Ratchets:
Storage Balance*
Percentage (%)
   
Storage Balance
(Dth)
MDWQ
Percentage (%)
Available Daily Withdrawal Quantity (ADWQ) (Dth)
   
0       to ____%
   
   
   
   
____ to ____%
   
   
   
   
____ to ____%
   
   
   
   
____ to ____%
   
   
   
   
____ to ____ %







Issued by: Jim Goetz
Issue date: 11/05/07 Effective date: 12/05/07