| Cameron Interstate Pipeline LLC | Original Sheet No. 69 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) to commence, and other factors determined to be relevant by Pipeline. The NPV shall also include only revenues generated by the reservation rate, or other form of revenue guarantee, as proposed by the bidder(s). For purposes of its NPV evaluation, Pipeline will consider the aggregate NPV of two or more bids for minimum bid packages, provided that the combined quantity of capacity under those packages do not exceed the maximum capacity available for subscription. 4.4 Rejected Bids. Pipeline reserves the right to reject any bid lower than the minimum acceptable bid for the capacity that is subject to the open season. Pipeline may set a reserve price which will be the minimum rate for the minimum acceptable bid; provided, however, if Pipeline elects to do so it will: (i) set such reserve price prior to the time of posting; and (ii) present such reserve price to a trustee to be held in escrow confidentially until the conclusion of the bidding process so as to demonstrate that such reserve price was established at the time of posting. Irrespective of whether a bid has the highest NPV of the bids received, Pipeline may reject bids for service that: (i) may detrimentally impact the operational integrity of Pipeline's system; (ii) do not satisfy all the terms of the specified posting; (iii) contain terms and conditions other than those set forth in this Tariff; (iv) do not satisfy the Pipeline's creditworthiness criteria as set forth in GT&Cs Section 2.5; (v) contain contingencies that cannot be removed within a time frame acceptable to Pipeline; or (vi) result in incremental costs. 4.5 Binding Nature of Bids. All bids received during the open season remain binding on all bidders through the end of the open season unless withdrawn by the bidder through the same medium on which its bid was submitted; provided, however, a bidder may withdraw its previous bid and submit a bid with a higher NPV during the open season, but neither bidder (nor an affiliate of bidder) may submit a bid with a lower NPV. At the end of the open season, all bids either withdrawn by the bidder or not accepted by Pipeline shall become null and void.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |