| Cameron Interstate Pipeline LLC | Original Sheet No. 92 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) In the event Shipper, without prior authorization by Pipeline, takes on any Gas Day at any individual Delivery Point a quantity of gas which is greater than Shipper's applicable MDDQ or segment entitlement, then the quantity in excess of the MDDQ or segment entitlement shall be Shipper's Delivery Point unauthorized daily overrun for such Gas Day and GT&Cs Sections 7.5 through 7.7 shall apply. (e) Updating Delivery Quantity. Pipeline shall amend each affected Shipper's delivery quantity at any Delivery Point(s) to reflect any additional flexibility provided by incremental capacity expansion projects after: (1) Shipper and Pipeline have executed the Service Agreement for such incremental service; and (2) the incremental facilities related thereto have been constructed and are ready for service. 8.2 Installation Of Flow Control Equipment Pipeline may elect to construct, install, and operate flow control equipment at any location on its pipeline system whenever it determines in its reasonable judgment that such equipment will contribute to the safe, reliable, efficient and orderly operation of its pipeline system in a manner that is consistent with its obligation to provide service under all of its rate schedules. 8.3 Hourly Rates Of Flow (a) Uniform Flow Rates: All gas delivered to or by Pipeline under its transportation Rate Schedules shall be delivered at rates as constant as operationally feasible throughout the Gas Day, and except as provided in GT&Cs Section 8.3(b), Pipeline shall not be obligated to deliver gas under its transportation Rate Schedules in excess of uniform hourly rates.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |