| Cameron Interstate Pipeline LLC | Original Sheet No. 163 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) (c) viewing and downloading operational data for any Gas Day on the second subsequent Gas Day; and (d) viewing Pipeline's notice of an OFO as contemplated by GT&Cs Section 9. 35.3 The Pipeline's Internet Web Site shall contain at a minimum information regarding: (a) the unsubscribed capacity available on the System for firm and interruptible transportation, including capacity availability on the system and at Receipt Points and Delivery Points; (b) the operationally available capacity on the System for firm and interruptible transportation, including capacity availability on the system and at Receipt Points and Delivery Points; (c) the master Receipt Point list and the master Delivery Point list including for each the following: (i) Designation of Delivery or Receipt Point; (ii) Location of Delivery or Receipt Point; (iii) Operator name and phone number; and Total firm capacity subscribed at the Delivery or Receipt Point. (d) the Capacity Release information described in GT&Cs Section 11 herein; (e) offers to purchase released transportation rights from firm Shippers; (f) Index of Shippers; (g) Pipeline's currently effective FERC Gas Tariff and GT&Cs; (h) critical Notices (when operational);
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |