| Cameron Interstate Pipeline LLC | Original Sheet No. 91 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) (c) More than One Shipper. If the quantity of gas delivered at a single Delivery Point is applicable to gas delivered by Pipeline to more than one Shipper, then the total measured quantity shall be allocated in accordance with the PDA methodology chosen by the Delivery Point operator in accordance with GT&Cs Section 7.3. (d) Delivery Point Authorized Daily Overrun. Shipper may submit to Pipeline a request for an authorized waiver of Shipper's MDDQ or segment entitlement on the Gas Day prior to scheduled flow or on the Gas Day of scheduled flow. Pipeline may transport for Shipper the requested deliveries in excess of Shipper's MDDQ or segment entitlement to the extent physical operating conditions permit and to the extent Pipeline is able reasonably to determine that such deliveries will not impair Pipeline's ability to provide firm service to other Shippers on Pipeline's system. In such circumstances, the delivery of gas in excess of Shipper's MDDQ or segment entitlement will be firm, provided that the total scheduled deliveries for such Shipper at all of its Delivery Points do not exceed Shipper's MDTQ.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |