| Cameron Interstate Pipeline LLC | First Revised Sheet No. 6 : Effective | |
| FERC Gas Tariff | Supersedes Original Sheet No. 6 | |
| Cameron Interstate Pipeline LLC | ||
SUMMARY OF RATES AND CHARGES (All rates in $/Dth) Currently Effective Rates Reservation Usage Charge Charge Maximum Minimum Maximum Minimum Rate Schedule FT FIRM TRANSPORTATION SERVICE Monthly Forward Haul $1.3607 $0.0000 $0.0000 $0.0000 Monthly Backhaul $1.3607 $0.0000 $0.0000 $0.0000 AOS Forward Haul $0.0000 $0.0000 $0.0447 $0.0000 Backhaul $0.0000 $0.0000 $0.0447 $0.0000 IT INTERRUPTIBLE TRANSPORTATION SERVICE Forward Haul $0.0000 $0.0000 $0.0447 $0.0000 Backhaul $0.0000 $0.0000 $0.0447 $0.0000 FUEL RETAINAGE PERCENTAGE: [\1] 0.2% ACA SURCHARGE: % ______________________________ [\1] All Shippers shall pay a Fuel Retainage Percentage surcharge as set forth in GT&Cs Section 22, except for Backhaul service. This Fuel Retainage Percentage shall be in addition to the rate(s) specified above. [\2] All Shippers shall pay an ACA surcharge as set forth in GT&Cs Section 24. This surcharge shall be in addition to the rate(s) specified above.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |