Cameron Interstate Pipeline LLC   Original Sheet No. 98 : Effective
FERC Gas Tariff
Cameron Interstate Pipeline LLC


GENERAL TERMS AND CONDITIONS

(continued)


 


 

10.2 In the event that service is curtailed then Pipeline shall reduce

each Shipper's scheduled service in the following order:


 

(a) first, ratably for interruptible transportation service

except for those Shippers' services included in (b)

below. Pipeline shall allocate capacity among Shippers

paying the same rate pro rata on the basis of scheduled

quantities;


 

(b) then, ratably to Shippers paying the maximum rate under

the Rate Schedule IT, scheduling interruptible service;

provided, however, Shippers paying a negotiated rate

which exceeds the maximum rate will be considered for

purposes of this Section 10.2(c) to be paying the

maximum rate; and


 

(c) then, pro rata on the basis of MDTQ to Shippers having

scheduled services previously confirmed pursuant to

Pipeline's Rate Schedule FT for AOS service, at

Secondary Receipt Points or Secondary Delivery Points;

and


 

(d) then, pro rata on the basis of MDTQ to Shippers having

scheduled services previously confirmed pursuant to

Pipeline's Rate Schedule FT for AOS service, at Primary

Receipt Points or Primary Delivery Points; and


 

(e) then, pro rata on the basis of MDTQ to Shippers having

scheduled services previously confirmed pursuant to

Pipeline's Rate Schedule FT, at Secondary Receipt Points

or Secondary Delivery Points; and


 

(f) then, pro rata on the basis of MDTQ to Shippers having

scheduled services previously confirmed pursuant to

Pipeline's Rate Schedule FT, at Primary Receipt Points

or Primary Delivery Points.







Issued by:
Issue date: Effective date: 11/01/08