| Cameron Interstate Pipeline LLC | Original Sheet No. 101 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) (b) affirmation that all sources of gas supply available to Shipper, including peak-shaving and storage, were and are being utilized to the maximum extent possible during the time period for which the exception to the curtailment provisions of this Section 10.6. is in effect; (c) affirmation that all interruptible services and sales provided by Shipper were and are being discontinued during the time period for which the exception to the curtailment provisions of this Section 10.6 is in effect; (d) affirmation that no alternate fuel could be utilized or is available to be utilized to prevent the necessity for an exception to the curtailment provisions of this Section 10.6; and (e) affirmation that, if the Shipper Emergency Situation is an environmental emergency, the Shipper has made and continues to make all feasible efforts to resolve the environmental emergency, including requests for waiver, exemption, and other relief from any regulation, directive, order or other equipment of a governmental body. Shipper shall provide Pipeline immediate notice of the cessation of the Shipper Emergency Situation. Notwithstanding any provision of this Section 10.6, however, Shipper shall not be entitled to relief under this Section 10.6: (1) to the extent that a Shipper Emergency Situation is due to the Shipper's failure to have adequate transportation arrangements in effect for the delivery of Shipper's gas at the Receipt Points or Delivery
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |