| Cameron Interstate Pipeline LLC | Original Sheet No. 105 : Effective | |
| FERC Gas Tariff | ||
| Cameron Interstate Pipeline LLC | ||
GENERAL TERMS AND CONDITIONS (continued) 11.1 Service Agreements Eligible for Capacity Release. Shippers under any firm Service Agreement, except as specifically restricted by the applicable rate schedule, are permitted to release their firm capacity in whole or in part, on a permanent or temporary basis, and on a firm or recallable basis. Such Releasing Shipper may propose an entity to obtain its released capacity from Pipeline. 11.2 Notice. Notice of Capacity Release. A firm Shipper that wants to release any or all of its capacity shall post the release on the Pipeline's Internet Web Site or, where applicable, by electronic data interchange by the posting deadline as determined pursuant to GT&Cs Section 11.3. Such Releasing Shipper's Notice shall provide the terms and conditions of the release as follows: (a) the releasing agreement; (b) on a permanent or temporary basis; (c) on a firm or recallable basis including the specifics of any recall right, as well as reput method and rights; (d) the Gas Day upon which the Bid Period will expire if other than as specified in GT&Cs Section 11.3; (e) the quantities to be released at specific locations; (f) the period of time or term, including any objective, not unduly discriminatory right of recall; (g) any Prearranged Shipper proposed to obtain released capacity under the rates, terms and conditions contained in the Releasing Shipper's Notice; (h) the minimum Reservation Rate, if any, or, if the Releasing Shipper elects; the minimum Reservation Rate restated on a volumetric basis.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |