GENERAL TERMS AND CONDITIONS (continued) 11.4 Posting Requirements for Capacity Releases Not Subject to Bidding. For proposed capacity releases of a duration of thirty-one (31) Gas Days or less for which the Releasing Shipper has obtained a Prearranged Shipper and the Releasing Shipper elects not to post such capacity releases pursuant to GT&Cs Section 11.3(a)(1), such information will be posted on the Pipeline's Internet Web Site as required by GT&Cs Section 11.3(a)(1). Contractual arrangements for releases not subject to bidding shall be processed in the same time period as those releases subject to bidding. 11.5 Allocation of Released Capacity. (a) Pipeline shall select the Best Bid as defined in GT&Cs Section 11.5(d) from among the bids received. However, if more than one bidder submits the Best Bid, the first bidder in time, shall be selected and posted as the Best Bid, unless the Releasing Shipper specifies another tie- breaking methodology in the Releasing Shipper's Notice. Notwithstanding the foregoing, if a Prearranged Shipper matches the highest bid, that Prearranged Shipper's bid shall be deemed the Best Bid. Pipeline may reject any bid that is less than the maximum rate. (b) In the event a contingent bid is submitted pursuant to GT&Cs Section 11.2(l), the Replacement or Prearranged Shipper submitting the contingent bid shall have one hour from 2:00 p.m. CCT to 3:00 p.m. CCT on the day the Bid Period ends to eliminate the contingency or withdraw its bid. If the Replacement or Prearranged Shipper fails to notify Pipeline that the contingency is not eliminated within such time, such contingent bid shall be deemed rejected by Pipeline for failure to eliminate the contingency in accordance with the releasing Shipper's Notice.
| Issued by: | ||
| Issue date: | Effective date: 11/01/08 | |