Unsubscribed Capacity

TSP Name: Leaf River Energy Center
TSP: 806804410
Posting Date/Time: April 25, 2024 01:33 AM CT
 
Eff Gas Day April 25, 2024
End Eff Gas Day: April 26, 2024
Capacity Type Description Unsubscribed capacity available from the pipeline
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Design
Capacity
Unsub Cap
Destin 809423697 N/A Injection Point SIQ 400,000 400,000
809423697 N/A Withdrawal Point SWQ 400,000 400,000
Gulf South 078444247 N/A Injection Point SIQ 327,376 327,376
078444247 N/A Withdrawal Point SWQ 327,376 327,376
Midct Express 808150895 N/A Injection Point SIQ 400,000 400,000
808150895 N/A Withdrawal Point SWQ 400,000 400,000
Sonat 006900518 N/A Injection Point SIQ 1,138,614 1,138,614
006900518 N/A Withdrawal Point SWQ 1,138,614 1,138,614
Tennessee Gas 001939164 N/A Injection Point SIQ 461,250 288,550
001939164 N/A Withdrawal Point SWQ 461,250 16,350
Transco 007933021 N/A Injection Point SIQ 840,000 840,000
007933021 N/A Withdrawal Point SWQ 840,000 815,000
Venture Venture Injection Point SIQ 8,500 8,500


Measurement Basis Description: Million BTU's (Dth)
Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute