Unsubscribed Capacity

TSP Name: Perryville Gas Storage LLC
TSP: 829608368
Posting Date/Time: January 26, 2023 01:33 AM CT
 
Eff Gas Day January 26, 2023
End Eff Gas Day: January 27, 2023
Capacity Type Description Unsubscribed capacity available from the pipeline
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Design
Capacity
Unsub Cap
Columbia Gulf Mainline 4235 Injection Point SIQ 500,000 310,943
4235 Withdrawal Point SWQ 500,000 59,542
EGT Line CP 822033/333 Injection Point SIQ 600,000 385,943
822033/333 Withdrawal Point SWQ 600,000 154,542


Measurement Basis Description: Million BTU's (Dth)
Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute