Operationally Available Capacity

TSP Name: Portland Natural Gas Transmission System
TSP: 159747872
Posting Date/Time: August 23, 2017 09:45 PM CT
 
Eff Gas Day/Time: August 23, 2017 10:00 PM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available unscheduled capacity
<< Previous Day Next Day >>
Location Name Loc Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
BERLIN 02-0260 Delivery Location RDQ D Y 1,506 1,506 135 1,371  
DRACUT 05-1150 Delivery Location RDQ D Y 210,840 210,840 17 210,823  
ELIOT - GS 05-0725 Delivery Location RDQ D Y 20,080 20,080 1,700 18,380  
ELIOT CNG 05-0750 Delivery Location RDQ D Y 9,000 9,000 0 9,000  
GORHAM 02-0650 Delivery Location RDQ D Y 125,500 125,500 45,845 79,653  
GROVETON - WP 02-0250 Delivery Location RDQ D Y 11,245 11,245 0 11,245  
HAVERHILL - KEYSP 05-1025 Delivery Location RDQ D Y 43,373 43,373 0 43,373  
HAVERHILL - TGP 05-1000 Delivery Location RDQ D Y 210,840 210,840 0 210,840  
JAY 02-0450 Delivery Location RDQ D Y 66,264 66,264 5,000 61,322  
METHUEN 05-1050 Delivery Location RDQ D Y 210,840 210,840 0 210,840  
MOUNT CARBERRY 02-0280 Delivery Location RDQ D Y 6,052 6,052 0 6,052  
NEWINGTON - EP 02-0775 Delivery Location RDQ D Y 60,240 60,240 29,798 30,443  
NEWINGTON - GP GYP 02-0800 Delivery Location RDQ D Y 4,819 4,819 1,758 2,762  
NEWINGTON - GS 05-0850 Delivery Location RDQ D Y 60,240 60,240 900 59,339  
NEWINGTON - PSNH 02-0900 Delivery Location RDQ D Y 80,320 80,320 0 80,320  
PITTSBURG 01-0100 Receipt Location RDQ R Y 168,672 168,672 226,431 0 Y
RUMFORD - PAPER 02-0350 Delivery Location RDQ D Y 25,100 25,100 2,419 22,680  
RUMFORD - POWER 02-0400 Delivery Location RDQ D Y 46,184 46,184 0 62,109  
WESTBROOK - GS 05-0600 Delivery Location RDQ D Y 80,320 80,320 10,371 70,249  
WESTBROOK - M&N 05-0525 Delivery Location RDQ D Y 168,672 168,672 133,737 39,048  
WINDHAM 02-0475 Delivery Location RDQ D Y 6,024 6,024 60 5,963  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute