Portland Natural Gas Transmission System   Original Sheet No. 319 : Effective
FERC Gas Tariff
Portland Natural Gas Transmission System


                   GENERAL TERMS AND CONDITIONS (Continued)
   
       5.3 Temperature.  The Gas to be made available to Transporter at the
Receipt Point(s) and made available to or on behalf of Shipper at the Delivery
Point(s) under this Tariff shall have a temperature of not more than one
hundred twenty (120) degrees Fahrenheit.
   
       5.4 Failure to Conform to Specifications.  If the Gas offered to be
made available to Transporter at the Receipt Point(s) or made available to or
on behalf of Shipper at the Delivery Point(s) shall fail at any time to
conform to any of the specifications set forth in Sections 5.1, 5.2, or 5.3,
then the party receiving such Gas (the "receiving party") shall notify the
other party (the "tendering party") of such deficiency and thereupon the
receiving party may at its option refuse to accept such Gas pending correction
by the tendering party.  Upon the tendering partys failure promptly to remedy
any deficiency, the receiving party may accept such Gas and may make changes
necessary to bring such Gas into conformity with such specifications, and the
tendering party shall reimburse the receiving party for any reasonable expense
incurred by it in effecting such changes.  In no event shall the failure of
any Gas offered for delivery to Transporter by Shipper or for Shippers
account to conform to any of the specifications set forth in Sections 5.1, 5.2
or 5.3 relieve Shipper of Shippers obligation to pay all applicable
reservation and/or usage charges. Further, Shipper shall reimburse Transporter
for all expenses incurred in repairing injuries to Transporters facilities
resulting from Transporters receipt of Gas for the account of Shipper which
does not conform to the specifications set forth in Sections 5.1, 5.2 and 5.3
and, notwithstanding the provisions of Sections 19 and 20, shall indemnify and
save harmless Transporter against any claims for damages arising from such
failure to conform to these specifications.







Issued by: David J.Haag, Rates And Tariff Specialist
Issue date: 07/28/06 Effective date: 09/01/06