Operationally Available Capacity

TSP Name: UGI LNG Storage
TSP: 007915069
Posting Date/Time: March 17, 2026 10:05 PM CT
 
Eff Gas Day/Time: March 17, 2026 09:00 AM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
TETCO VAPORIZATION FIT 2108 N/A Withdrawal Point SWQ SW Y 180,000 150,000 0 150,000  
TRUCKING Scales N/A Withdrawal Point SWQ SW Y 48,600 48,600 0 48,600  
UGIU LIQUIFACTION FT 10-2 N/A Injection Point SIQ SI Y 10,000 10,000 6,268 3,732  
UGIU VAPORIZATION FI 40-9 N/A Withdrawal Point SWQ SW Y 57,000 57,000 0 57,000  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute